Know the water risks of an unfamiliar area before you arrive
Geovatra Baseline gives water experts and project teams a documented first picture of an area of up to 5,000 km²: its flood risk, drought, or water supply, or a short General look that says which to study first. Every number is traceable to its source, and every report says what isn't known. In English, French and Arabic.
Complete, defensible, fast: and measured
Complete
One report per purpose, from terrain to questions for the field.
- Flood9 modules
- Drought8 modules
- WASH and water supply9 modules
- General6 topics
Defensible
Against the observed 2012 Niger flood at Lokoja and Idah, the flood-prone zones scored as well as the best global flood model in the published study (0.78 / 0.7).
- Drought vs Kenya's early warningr 0.953
- Methods log for every run
Fast
Measured end to end for about 5,000 km², including the report and the data package.
- Lokoja, Nigeria: data already kept4.8 min
- Buzi, Mozambique: data already kept5.4 min
- Buzi, Mozambique: first run in the country11.4 min
A report to read, and the data to keep working
Geovatra Baseline
Set your study area (draw it, upload it, or pick a district or a river basin), choose a purpose and, if you like, the date a past flood began. You get a PDF report with maps and a checklist of questions for the field, in English, French or Arabic; a data package for any GIS (GeoTIFFs, GeoPackage, CSV tables, with ready-made colours for QGIS and ArcGIS); and run.json, the methods log behind every number.
Sample reports: Flood, Lokoja · Drought, Laisamis · WASH, Laisamis · General, Lokoja (each also in French)
Map assistant
Upload your data, draw on the map, fetch satellite data and run vector, raster and hydrology operations by asking in plain English. It knows your area's Baseline: ask which health sites are in zone A, and the answer comes from the Baseline's own files, with a methods log. The AI runs on Mistral's EU servers.
People who must understand an unfamiliar area quickly
Mission experts
Experts sent on short water missions who need the basics on day one.
Water consultancies
Teams scoping and preparing projects abroad.
WASH teams
UN and NGO water, sanitation and hygiene teams.
Screening from open global data, not engineering design
A baseline shows where to look and what to check. It isn't checked in the field; for flood it covers river flooding only, for drought it doesn't see groundwater or soil moisture, for water supply it knows only the water points someone has recorded and doesn't assess water quality or sanitation, and it says plainly what it doesn't know. People and facilities are given as totals per zone, never as locations.
Tell us what slows you down
If you work on water projects, we'd like to hear what takes the most time at the start of a mission, and what a baseline would need to be useful to you.